PROJECTS
Bemco – SEC Riyadh PP12 CC Project
Location: Riyadh
Client: Bemco International
Contractor: Alzamil Metal Works Factory
Commencement: 25/08/2013
Scope: Engineering, PWHT of all 6 vessels that was carried out in a post weld heat treatment furnace, All tanks were insulated and aluminum cladding done before shipment, Supply of materials, Fabrication and Testing of the following items:
- Condensate Receiver Tanks
- Pressure Vessel Type
- Vertical Tank with Two Ellipsoidal Heads. Dia 2.95m x height 3.8m.